Wednesday, January 6, 2016

Finally A Place to Relax

While all the work on the main floor is being done by a contractor, my husband has been working on the basement.  Our goal was to complete the basement so we would have a place to relax and live a somewhat normal life.  After two and a half months, the basement is almost done.  It is smaller than our previous house, but very cozy.  



We brought in the basics to get us by for a few weeks.

A new countertop, sink, microwave and mini fridge have been installed in the basement kitchenette.




I still have to paint the cabinets.





What a difference these craftsman shutters make!





I ordered the hinges online from Antique Hardware.  Did you know that these are called "shutterdogs"?



The walk in shower tile is done.

I am in love with this stainless steel farmhouse sink!


 Seeing this pull in my driveway today made me jump for joy!





As you can see, it has been a very exciting week at our little fixer upper but there is still more to do. 

Monday, December 28, 2015

The Work Continues

Since my last post a lot has happened and things are really shaping up.


I removed all the plastic window panes.


Now we have this view.



We added new outside lighting.


From this:




To this! 




The handrails going to the basement were removed.



My husband built new ones with more of a craftsman look. He is not quite finished with them.





Tile is being installed in the master bath.






Craftsman shutters have been built.





Hardwood flooring is being installed.





New kitchen cabinets






Board and batten in the basement. Also installed by my husband.







The improvement that really changes the look of the house are the rough hewn cedar columns.



Along with all this there was Christmas shopping.  Whew! 

Wednesday, December 9, 2015

A New Roof Over Our Heads

It has been eight weeks since we moved into our fixer upper and the worst part of the renovation is OVER!  For the last 3 weeks we have been living in sheetrock dust but now it is done and cleaned up.  The house is really starting to take shape.  A lot of work has been going on outside too.  We have a new roof over our heads.  


We chose a weathered brown that matches perfectly with the brick and the new paint.  


The white columns will be removed and replaced with rough hewn cedar.  

A new window was installed in the upstairs hallway.  This is what it looked like before:


When we saw this house for the first time, we knew that the current central unit must not be cooling properly since there was a window unit in the hallway. We had a new central unit installed just for the upstairs bedrooms. 



Now we have a beautiful view of the lake from the upstairs hallway!

Tomorrow the trim work begins.

Monday, November 23, 2015

Time To Paint

It's time for the exterior painting to begin before it gets too cold.  The siding and trim are white which is a little too stark against the brick so I want to tone it down.  I have chosen Sherwin Williams  "Downing Sand".  It is a creamy beige that will blend perfectly with the brick.


These shutters will be changed to a craftsman style and I have chosen a dark brown. 
I needed some help in choosing the front door color so I headed back to Sherwin Williams.  We narrowed it down to two colors:  Slate Tile and Dried Thyme.



The painter even helped with my decision by painting a larger area for me.  



Dried Thyme won!  That door knocker needs a good polishing too. 



The railing is done!
I love how it follows the curve of the steps!


One project finished.  After it cures, we will stain it slate gray.

Many people have asked who is doing the construction. 

Now it is time to start the next project.

Thursday, November 19, 2015

Sheetrock is Hung

I am starting to learn the lingo of the construction workers. They have been hanging "rock".  What a difference it makes too.  We can now see the actual rooms.  


The entry to the living room has been sheetrocked to become our bedroom.


The kitchen is done and the opening to the left is for the breakfast bar.


Basement is done and the suspended ceiling is GONE!


The walk in shower is done. It is going to be doorless.  I love the glass shower enclosures but I do not want to have to keep the  glass clean.  Been there done that!


While all of this has been taking place inside, a lot has been going on outside too.   A hand rail extending down to the dock is being added.  My husband and my son's father in law are building it.  It sure helps when walking up the hill.  It will be stained a dark color to blend in with the surroundings just like we did at our previous house.  



This is the fence my husband built at our former house. As you can see, the dark stain blends in with the surroundings really well.  I do miss that back yard, but I keep telling myself that the new one will look just as good when we finish plus it has water.